Made Strategies · City and county resources
Affordable housing
How many renters are stretched, what is getting permitted, and which public contribution could move a project forward? Start with your community’s numbers, then bring a funding scenario to the table.
Local housing dashboard
Compare a city with its county or a peer community. Choose the same survey period for both. Census places include incorporated communities and census-designated places.
Primary
Comparison
Loading geography choices. The Riverside County baseline below is from the 2020–2024 ACS.
Riverside County, CA
Housing units authorized by permit
Monthly Census Building Permits Survey. Counts cover units authorized for new privately owned housing.
A permit can authorize several units. Completions and affordable-unit counts require separate records. An unreported or unmatched month appears as N/A. Place totals cover the matched permit-issuing jurisdiction.
Methods, release dates and source tables
Gross rent includes contract rent and applicable utilities. Burden percentages use renter-occupied units for which the gross-rent-to-income ratio could be calculated. Severe burden is a subset of total burden. A zero denominator or suppressed estimate appears as N/A.
Published 90% margins of error appear beside unit counts and median rent where available. Derived shares are rounded to one decimal and have no margin displayed. Small-area estimates can be imprecise. A city and its county overlap, so their counts should not be added.
2020–2024 five-year ACS released January 29, 2026. The 2025 one-year release, October 29, 2026, has less geographic coverage. Select one period at a time. Permit observations have their own dates.
ACS summary files · Current Census permit releases · HUD Fair Market Rents · HUD tax-credit income limits
Sources and survey notes
Affordable housing tools and incentives
Start with the decision your council or board can make. A city might contribute a parcel or change a development standard. A county might coordinate gap financing across cities. The developer still needs a feasible budget and an operator for the finished homes.
How the Low-Income Housing Tax Credit works
LIHTC helps finance income- and rent-restricted rental housing. Investors provide equity in exchange for federal credits. The value of that equity depends on the project’s qualifying costs, award and investor terms. The percentages below describe credit rates applied to qualified basis.
9% competitive credits
Start with the allocating agency’s Qualified Allocation Plan (QAP). Test the proposed tenant population, affordability period, site, scoring criteria and local funding against the current round.
Local decision · Can the jurisdiction document a land or funding commitment before the application deadline?
Find your state housing finance agency4% credits with tax-exempt bonds
Bring the developer, housing agency and bond issuer together to check bond availability, issuing deadlines and eligible costs. Federal bond-financing thresholds and transition rules depend on the issue and placed-in-service dates.
Local decision · Who will issue the bonds and what gap remains after debt and expected equity?
IRS bond-financing guidanceCheck geography, rent limits and existing properties
Use HUD’s Qualified Census Tract and Difficult Development Area map for the project year. Screen an Opportunity Zone separately. Check the applicable Multifamily Tax Subsidy Project (MTSP) income limits, unit mix and utility allowance with the allocating agency before quoting restricted rents. Fair Market Rents serve different HUD program purposes.
HUD QCT and DDA maps · MTSP income limits · LIHTC properties and tenant data · Opportunity Zones 2.0 finder
Close a capital gap with HOME or the Housing Trust Fund
Ask the HOME participating jurisdiction whether its current plan can support acquisition, rehabilitation or rental construction. For deeply affordable units, ask the state Housing Trust Fund administrator about its allocation plan, rent requirements, operating costs and application timing.
HUD affordable housing programsPay for eligible site work or rehabilitation with CDBG
Ask the grantee to identify the eligible activity and national objective for each expense. Acquisition, rehabilitation or qualifying infrastructure may fit. New housing construction is generally ineligible except under specific authorities. Keep construction and site-work costs on separate lines.
HUD Community Development Block GrantSupport operations or rural rental housing
Ask the public housing agency whether it is selecting properties for project-based vouchers. Voucher assistance can support eligible occupied units over time. For a rural site, ask a qualified lender and USDA Rural Development whether a Section 538 loan guarantee fits.
HUD project-based vouchers · USDA multifamily loan guaranteesUse local land, fees and land-use incentives
Compare a public ground lease, a fee deferral, utility improvements and a zoning or density incentive. Identify who has authority, what value the public contributes and what affordability term it receives. A deferred fee still comes due. Show its timing in the cash flow.
Screen site control and approvalsCalifornia funding and approvals
Check CTCAC and CDLAC for the applicable tax-credit and bond round. Review HCD’s Permanent Local Housing Allocation for local funding and AHSC for housing paired with transportation. For a density bonus, have planning staff confirm the qualifying units, available incentives and local process.
California 2026 tax-credit and bond applications · PLHA · AHSC · California density bonus guidance
How affordable apartments are financed
A developer plans 40 affordable apartments with a total development budget of $14 million. The team starts with the income the finished homes can generate, then works out how much money it can raise to build them. All amounts in this example are hypothetical.

What can the rents cover?
Forty homes renting for an average of $1,250 a month could bring in $600,000 a year at full occupancy. The developer allows $30,000 for vacancies and $270,000 for operating expenses, leaving $300,000 a year before loan payments.

How much can it borrow?
The lender wants at least $1.20 of operating income for every $1 of loan payments. With $300,000 of annual operating income, the building can support up to $250,000 in annual payments. A $3.4 million mortgage at an assumed 6% over 30 years fits within that limit.

Who invests in the homes?
Suppose the project receives a federal Low-Income Housing Tax Credit allocation worth $1 million a year for ten years. At an assumed 85 cents per dollar of credit, an investor contributes $8.5 million to the project in exchange for the credits. This cash adds to the mortgage proceeds.

How can the city help?
The $3.4 million mortgage and $8.5 million in investor cash cover $11.9 million of the $14 million budget. That leaves $2.1 million. The city could consider a $2.1 million deferred-payment loan, or contribute land that lowers the amount the developer must spend to acquire the site.
Financing assumptions and sources
The rent is an assumed average payable to the owner. Check applicable rent restrictions and utility allowances before using local figures. With equal monthly principal and interest payments, annual debt service on the example mortgage is approximately $244,617. The example assumes no required current payments on a city loan. Count a land discount once, using the acquisition cost already in the budget. A local contribution requires its own review and approval.
Colorado Housing and Finance Authority’s feasibility guide · Federal housing tax credit law · Urban Institute housing cost example
Test a local funding contribution
Bring your own development budget. See how much a proposed local contribution would close and the remaining gap per restricted home. Include tax-credit equity in committed sources only when the amount is documented.
Enter costs and funding to calculate the remaining gap.
Planning arithmetic only. Keep uncommitted sources, ongoing operating subsidy and land already counted in the budget separate.
Housing training room
Watch a briefing together before a housing workshop. Each player loads when selected.
Read local housing data
U.S. Census Bureau · 2026
Use Census tables and maps to prepare a local housing baseline.
How housing credits work
Novogradac · 2010 · introductory
Follow the basic exchange between a housing developer and investors. Use the current agency guidance above for today’s rules.
Housing credits and Opportunity Zones
Novogradac · April 2026 · policy discussion
Hear how practitioners discussed LIHTC and Opportunity Zones at that point in the policy cycle.
Bring a housing decision to Made Strategies
Share the geography, the decision date and the question facing your council or board. We can scope a housing needs brief, a preservation or development site comparison, or a local incentive analysis.